FML - Fire Management Limited

APPROVED DOCUMENT B (AD B)

APPROVED DOCUMENT BApproved Document B contains detailed guidance on fire safety set out in time periods of stability, integrity and insulation for the various elements of the building. Within the document, buildings are split according to type with the following main sectors:

By demonstrating compliance with AD B a developer is 'deemed to have satisfied' the Building Regulations.

Approved Document B also recognises the benefits in confidence and reliability obtained by the use of accredited Installers like Fire Management Ltd.

Web Site Design Shrewsbury, Shropshire by Interactive Information Services Limited